NGV Global

  • Market Developments
    • CNG Cylinders
    • Vehicles
    • Equipment
    • Infrastructure
    • Maritime
    • Business
    • Industry Notices
  • Events
    • Upcoming
    • Event News
  • Vehicles & Fuels
    • Alternative Fuels
    • Biomethane
    • Compressed Natural Gas (CNG)
    • Hydrogen
    • Liquefied Natural Gas (LNG)
    • Natural Gas Vehicles (NGV)
  • Policy
  • Safety
  • Standards
  • Technology
    • Motorsport
    • Refuelling
    • Gas Storage
    • Engines
  • Association News
  • Editorial & Comment
  • People
  • Advertisers
  • Follow us on Twitter
  • Subscribe to our RSS Feed
  • Home
  • About
  • Members Portal
  • Subscribe
  • Contact
  • Calendar
  • Advertise
  • |
  • Español
Loading

Clean Energy Opens First Large-Scale California LNG Production Plant

November 23, 2008

USA, Seal Beach, CA 

Deliveries are under way from Energy Fuels Corp’s new California LNG Plant at Boron, California, to Clean Energy’s new LNG port truck fueling station in Carson, California. Reportedly the largest LNG (liquefied natural gas) production plant in the Southwest and the first large-scale plant in California, it has been built to produce up to 160,000 gallons per day of LNG, upsizing to 240,000 gallons per day as demand increases.  The facility includes a 1.8-million-gallon LNG storage tank as an important regional supply source and to provide reserves for unanticipated demand.

The Clean Truck Program at the ports anticipates replacing over 8,000 old diesel trucks with new trucks that are proven to be cleaner than diesel, such as LNG trucks, within five years.  These trucks are anticipated to be a major consumer of the LNG fuel produced at the California LNG Plant. “Already new, cleaner LNG trucks are rolling at the ports and throughout Southern California, lowering emissions pollution and providing cheaper fuel from domestic sources for trucking fleets,” noted Andrew J. Littlefair, President and CEO of Clean Energy.  ”We also have begun construction on our second regional LNG truck fueling station in Arizona, which is scheduled for completion in March 2009.”

Print Friendly Print Get a PDF version of this webpage PDF
Categories: Market Developments | Comments (0)